California, Arizona, & Nevada A leader in the fire protection industry Service areas include:

30+

Years in business edit

About us 

Advanco Fire Protection, Inc

Advanco Fire Protection, Inc. was founded in 1990 by Rigoberto Vazquez. Sr.. 

Our employee’s commitment and hard work have been the cornerstone of our success. Advanco Fire Protection, Inc.’s original office located in Walnut, California was outgrown within a year. A new office in Pomona, California only lasted 2 years. A move to Montclair, California allowed the beginning of in-house fabrication in 1994. Advanco Fire Protection, Inc. moved to their current location – 615 S. Oaks Ave. Ontario, California – in 1997. This provides 20,000 sq. ft. fabrication shop and yard and 8,000 sq. ft. office space, but with projects being primarily 1.8 million sq. ft. buildings Advanco Fire Protection, Inc. is continuing with the pattern of growth. 

We specialize in

 design, fabrication, installation, testing, & maintenance of fire protection systems for large office and warehouse spaces. 

Design

Once the parameters for a system are established, our designers use advanced technology to create an original fire protection system that meets your individual design requirements. Our design specialists utilize the latest design technology. Contact Us

Fabrication

Our objective at Advanco Fire Protection, Inc. is to continue to be a leader in the fire protection industry. This will be achieved by meeting the needs of our customers and providing the best quality workmanship, equipment and materials possible. Contact Us

Installation

Our crews are equipped with the finest training and tools to ensure the installation of a properly functioning fire protection system. One size doesn’t fit all – we specialize in the design, installation, testing, inspection and maintenance. Contact Us

Advanco Fire Protection, Inc.

In design, fabrication, installation, testing, & maintenance of fire protection systems for large office and warehouse spaces. 

Our projects

The following are some of our completed projects.

Intex Fontana Commerce Center (Phase I & II)

Fontana, California
Two (2) single story tilt-up warehouses Phase I: 330,000 s.f. / Phase II: 401,000 s.f. , ESFR fire sprinkler systems.

Fluidmaster

San Juan Capistrano, California
175,000 s.f. office and manufacturing facility and 25,000 s.f. support and recreation building.

Duke Rider

Perris, California
1.2 million s.f. (under one roof) distribution/warehouse facility

Skechers Distribution

Moreno Valley, California
Phase I: 1.82 million s.f.
Phase II: 780,000 s.f.
Total 2.6 million s.f. (under one roof)

Fluidmaster

San Juan Capistrano, California
175,000 s.f. office and manufacturing facility and 25,000 s.f. support and recreation building.

Hershey /Redlands

Redlands, California
590,000 s.f. tilt-up distribution center